Full testing for manufactured systems

Testing

After testing engineers receive the characterization of testing requirements drawn up by the Development and Engineering Department and the Project Management (all under a single roof) joint meetings are held to brainstorm problems. This work methodology allows testing engineers to make changes or use their extensive experience to improve the testing system defined by the client and the Engineering Department.

At the ATE stage, the Project Management oversees the integrated design and development of the automatic testing equipment to ensure a better, more efficient system, based on many years of accumulated knowledge and experience in testing system development.

CLT capabilities include: In-depth understanding of customers' requirements, user friendly designs using the sector's standard development tools (such as National Instruments Lab Windows CVI and Test Stand) and proven experience assimilating ATE systems on production lines at the world's leading manufacturers of communication products